Friday, September 10, 2010

Paint, tile and more!


Excavating for the Entryway.

Paint colors have been chosen (left swath) light brown below, darker brown above and a very dark brown trim (almost black).

The heating and cooling units will be just outside, one on the north side, and this one on the south side.

Tile work in women's bathroom.
Tile work in men's bathroom.
Electrical boxes being wired in mechanical room.
The electical cables are big (don't touch!)

Ken and Karen David and Bob Taylor have just installed the front skirt of the St. Vincent de Paul building. It is ready to have electricity hooked up. It will be painted to match the church. Steps and a wheelchair ramp will also be installed.

Bioswail plantings in lower end of parking lot looking east.

Bioswail plantings in lower end of parking lot looking west.