Mike Grant, our contractor, has built the legs of the altar he is donating to the parish. It looks like St. Joseph is building it!
.JPG)
Sidewalk along Springville Road.
.JPG)
Lighting in front of church.
.JPG)
Lights along the sidewalk going to the lower parking lot.
.JPG)
Lighting looking from church toward 178th Ave.
.JPG)
Getting ready to pour the gathering space in front of the church.
.JPG)
Doors and panels that will contain glass separating the
narthex from the sanctuary.
.JPG)
Siding on the upper walls in the
narthex.
.JPG)
Cabinetry in the mechanical room where there will be a sink and a
sacrarium.
.JPG)
Cabinetry in the women's restroom which will have three sinks.
.JPG)
Exit to patio behind west window.
.JPG)
West window with wood trim on frames.
.JPG)
Close up of wooden framing on west window.
.JPG)
Duct work is almost complete. Baseboards having sealer applied.
.JPG)
Baseboards drying.
Ambry is taking shape near the baptistry.
.JPG)
Landscaping looking toward southeast corner.
.JPG)
Lower entrance is complete, but will be used for emergency vehicles only.
Bioswail looking west from lower driveway.
.JPG)
Bioswail looking east.