Sunday, October 3, 2010

Getting down to the details

Driveway sidewalk being prepped.

Driveway sidewalk rebar.

New driveway and church in background.

New sidewalk in front.

Electrical room. Power is now through out the property.

Lights are being hung. Notice the metal ring in the foreground over the baptistry upon lights will be placed.

Electrician working on light cables. The white light fixture to the right will eventually run the length of the beam.

Painting clearcoat on the ceiling that extends from inside to outside. Cables hanging down will hold a halo of lights over the altar.

Covers for duct work being set in place.

Baseboards being installed.

Access from parking area for the disabled.

Plants ready to be planted.

St. Vincent de Paul building painting prep.

St. Vincent de Paul building painted. Henry (on roof) and Karol Mesa, Bob and Tammy Taylor.

Shelving for StVdP bought on Craigslist being set in place on new flooring.

Ken and Karen David with Kathy Yee in StVdP building.

Dave Lindenmuth and others attacking some blackberry bushes.

Tom Quillin and Dennis Desmarais helping to clear brush.

Mike Tierney and Dave Marcantuono making a difference.

No comments:

Post a Comment