Saturday, May 29, 2010

The Sustainable Heating System

In the following photos you can see the tubing that will be supplying the hydronic heating system. Picture 01 shows the mechanical room foundation on the north side of the building and some plumbing where water will be heated or cooled, depending on the weather. You can see trenches and tubing (flexible pipes) that lead to the building. During the winter this tubing will bring hot water to the hydronic pipes in the floor slab of concrete (the slab will be poured later this summer). The hydronics will heat up the entire slab to the desired temperature and return the slightly cooled water to the water heater in the mechanical room again. It is a closed system, that is, once it is filled with water there is no need to add any more water and it won’t leak out. In the heat of summer it will send cool water to cool the slab and keep the church at a comfortable temperature. Since the concrete slab holds heat or cold for a long time it will cost far less energy and money to maintain the desired temperature.


Hydronics tubing going to mechanical room


The following pictures (02-05) show where the tubing comes into the building and look like giant worms. (Yuk!) There is also a photo of the end of one of these tubes so that you can see both the incoming and outgoing plastic pipes wrapped in lots of insulation so that little to no heat/cooling is lost in the transition.

Additionally there are vents up in the clear story that can be opened to let out hot air in the summer and windows along the floor that will let in cool air. There are also fans in the clear story if there needs to be some assist.

There will be a supplemental system that will blow cool or warm air into the sanctuary. This will be used, for example, on an oppressively hot August day at a wedding where we need to kick it in on for an hour before the wedding starts then shut it off.

The narthex will have forced air gas. The fans, including those in the clerestory, are only backup systems. Those motors are what consume the most energy. They will only be needed during extreme weather situations.

Hydronics tubing going on North wall

Hydronics hose tubing behind Northwest sanctuary door


Hydronics tubing coming in behind Southeast Sanctuary door

Close up of insulated hydronics tubing




The Narthex

The last picture (06) shows the beginnings of the narthex (looking west). The panorama shot distorts the image. It is not fanned out as it appears. The walls are straight. The slabs are poured on the right and left. The center slab (entry way) will not be poured until near the end of the project because it will be the finish concrete with a rose design cut into it.

On the left and right at the entrance will be the men’s and women’s bathrooms, respectively. Then on the left, closest to the sanctuary, will be a mechanical/utility room which will have the heating unit for the baptistery as well as a floor janitor’s sink and a utility sink, a sacrarium (for purifying the chalices), cabinetry (to store chalices and other items) and a small refrigerator.

The room on the right of the narthex, toward the entrance to the sanctuary, will eventually be a Reconciliation Chapel (confessional). But until we get to Phase II this small room will have to serve as office space, and a confessional on weekends.
Initial construction of Vestibule