Saturday, September 4, 2010

Narthex concrete has been poured

Narthex concrete has been poured.

Looking into sanctuary from narthex.

Window framing is up in the west window.

Looking east out of the church from the baptistry. Floor-level heavy aluminum plates will go over the lower font


Duct work is underway to suplement floor heating.




Thursday, September 2, 2010

More Windows

The window and doorway being placed behind the sanctuary.

Installing the west window.

The Modular unit has been assembled and the floor reinforced. Next will be hooking up the power and building the accessible entrance. Whose bicycle is that?

Stations of the Cross

The Stations of the Cross will be marked with mosaics. See the Worship space diagram in the upper left column for placement of the mosaics.

Wednesday, September 1, 2010

A few videos.


Spreading the asphalt


Compressing the asphalt.

Tuesday, August 31, 2010

The paving of the parking lot!

Paving has begun in the lower parking lot!

Spreading the hot pavement.

Compressing the asphalt.

Preparing to pour concrete in the entrance and around the baptismal font.

Setting the duct work in place for when we need to augment the radiant floor (hydronic) heating and cooling system.

The irrigated bioswail is being prepared for plants which are capable of filtering all the water that runs off our property before it runs through drains into the wetlands in a lower part of the neighborhood.

Monday, August 30, 2010

Setting up the Baptismal font

Setting up the Baptismal font.


Preparing the parking lot to be paved.

Saturday, August 28, 2010

Less than two months until the dedication!

Recently poured slab for HVAC system on North side of church.

Removing forms after the first of two pours for the baptistry.

Putting up the gate on the lower end (South) of the parking lot. This entrance will only be for emergency vehicles. The upper entrance on 178th Avenue is the only one we will actively use.