The paving of the parking lot!

Paving has begun in the lower parking lot!

Spreading the hot pavement.

Compressing the asphalt.

Preparing to pour concrete in the entrance and around the baptismal font.

Setting the duct work in place for when we need to augment the radiant floor (hydronic) heating and cooling system.

The irrigated bioswail is being prepared for plants which are capable of filtering all the water that runs off our property before it runs through drains into the wetlands in a lower part of the neighborhood.