The painting was completed with the dark trim.
Doors are being hung like this one to the office.
Plumbers installing the baptismal circulation system.
The ambry will be completed after the dedication, but one can see the wood template on the left that will guide the fabrication of a metal cross.
Pew being put together before installation.
The hardwood floor being installed at the altar plinth.
Handrail at the ramp next to the presider's plinth.
Panorama of the pews set in place before they are bolted to the ground.
This stained glass window was in our cathedral before the renovation in the 1990s. Fr. George Wolf gave it to Fr. John Kerns for the new church. For now it will be in the chevron winow over the entrance.
No comments:
Post a Comment